File 39 · Frederick, Maryland
Sump Pump Readiness Docket
Record pit, power, pump, discharge, backup, and storm history.
Before storm conditions, note pit level, pump state, visible discharge path, power source, and any alarm or backup without entering the pit or bypassing controls.
Call about the plumbing 877-702-1610Symptom evidence
Five entries for this file
Use the status marks as prompts. They are not an online diagnosis.
Pit level
ObservedUnknownConfirm
Pump operation
ObservedUnknownConfirm
Discharge path
ObservedUnknownConfirm
Power
ObservedUnknownConfirm
Alarm or backup
ObservedUnknownConfirm
Decision sheet
Resolve before you act
Ask the provider to separate pump, check valve, discharge, power, alarm, backup, drainage, and exterior outlet responsibilities in the written option.
- Write the observed condition and date.
- Ask what evidence supports the diagnosis.
- Name the option, exclusions, and responsible party.
- Approve any changed scope in writing.
File note
Keep with this record
File the safe test result, installed equipment details, discharge observation, backup instructions, maintenance schedule, and any exterior drainage question.