File 44 · Frederick, Maryland
Fixture Replacement Decision Sheet
Compare fit, connections, supply, finish, and closeout.
Measure the opening and connections, identify supply and drain conditions, record the exact product, and note surrounding finish work before ordering or approving replacement.
Call about the plumbing 877-702-1610Symptom evidence
Five entries for this file
Use the status marks as prompts. They are not an online diagnosis.
Opening and fit
ObservedUnknownConfirm
Supplies and drain
ObservedUnknownConfirm
Exact product
ObservedUnknownConfirm
Surrounding finish
ObservedUnknownConfirm
Final test
ObservedUnknownConfirm
Decision sheet
Resolve before you act
The proposal should state who supplies the fixture, verifies compatibility, changes valves or drainage, protects finishes, removes the old item, and handles returns.
- Write the observed condition and date.
- Ask what evidence supports the diagnosis.
- Name the option, exclusions, and responsible party.
- Approve any changed scope in writing.
File note
Keep with this record
Keep model and serial information, installation instructions, operation and leak checks, finish condition, disposal record, and warranty contacts.